Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2020 | ELECTRIC - FINAL | Approved | RVI SECOND TIME CLEARANCE FOR INCR |
|
| 01/13/2020 | ELECTRIC - FINAL | Not ready for Inspection | Explain to Pedro that the clearance was already approved he just needs to call TEP and reconnect and then Call in the final again | |
| 01/08/2020 | ELECTRIC - FINAL | Correction Required | Contractor actually needs a clearance as TEP would not accept the last service. Overhead service mast is too low to meet the requirements of E3604.2.1. Contractor will provide gas and water bonds at next inspection after clearance is given | |
| 12/17/2019 | ELECTRIC - FINAL | Not ready for Inspection | Bond to gas and water. |