Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T19CM08129
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2019 | SITE - SEWER | Approved | Note: trench site has collapsing soils that caused 1 fatality. As pipe was layed and shoring was moved to the next section, soils would collapse into to trench and cover the pipe. Therefore, visual inspection of joints under test was not possible. Extensive energy was witnessed in joint connections and flow was witnessed upon completion at cleanouts. | |
11/13/2019 | SITE - SEWER | Partial Approval | New main line, from existing to hcs is in place and ready to test |