Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2019 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 11/13/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Reference comments from the previous inspection. | |
| 11/07/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall provide the listing for the flexible B-Vent for verification that it is approved for an exterior location. 2- Unit was locked, please provide access to all gas appliances inside. |
|
| 10/31/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Test gage was below 10 lbs minimum. 2- Shall provide access to inside of dwelling at the time of inspection request. 3- Note; Carbon monoxide detector required. |