Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2020 | ELECTRIC - CONSTRUCTION POWER | Approved | Re-inspected via pictures. Corrections completed. Clearance TEP ECO. Two meters; A and HP. |