Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2019 | PLUMBING - FINAL | Approved | Clear gas meter Verbal clearance called in at 9:34am |
|
| 10/28/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a gas line bond on the system. 2- Shall provide combustion air vents on the water heater enclosure. 3- Shall provide access to the appliances inside dwelling at the time of inspection request. 4- Shall provide a carbon monoxide detector and locate it in the hallway to the bedrooms or as per manufacturer installation standards. |