Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2019 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 12/06/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall provide a gas ground bond on the system. 2- Shall provide the correct and required test gage. 3- Shall provide a minimum of 1 inch clearance from combustible material for the water heater flu vent. 4- Shall terminate the water heater t & p drain 6 inches above grade. 5- Shall seal the penetration to the Range. |