Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/23/2021 |
ENGINEERING - FINAL |
|
Approved |
|
| 04/22/2021 |
ENGINEERING - FINAL |
|
Partial Approval |
Partially approved. Final work in progress. |
| 03/26/2021 |
ENGINEERING - FINAL |
|
Continued |
CONTINUED AT THIS TIME, BUT NOT FOR A CERTIFICATE OF OCCUPANCY. THE FOLLOWING THINGS WILL NEED TO BE ADDRESSED PRIOR TO REQUESTING AN ENGINEERING FINAL FOR THIS PERMIT. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, BOTH COMBO AND DEVELOPMENT PACKAGE. ENSURE ALL OTHER DEPARTMENTS ARE OK FOR THE FINAL CLOSURE OF THE PERMIT, THIS WILL INCLUDE BUT IS NOT LIMITED TO BUILDING, FIRE, WATER, TRANSPORTATION. PROVIDE ALL CLOSEOUT DOCUMENTATION FOR ALL PERMITS, THIS WILL INCLUDE APPROVED REVISED DRAWINGS FOR ALL PERMITS, CERTIFICATION LETTERS FOR THE DEVELOPMENT PACKAGE FROM THE ENGINEER OF RECORD, AND THE NOTIFICATION OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THE SWPPP. |