Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2020 | MECHANICAL - FINAL | Approved | ||
| 10/11/2019 | MECHANICAL - FINAL | Denied | 1- Shall extend and terminate the condensate drain line a minimum of 6 inches above sub grade. 2- Shall provide protection on for the condensate drain and properly secure the line on blocking. 3- Shall provide a sediment trap on gas supply. 4- Shall secure the liquid tight electric whip to the unit. 5- Shall provide access to the roof at the time of inspection request. |