Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2019 | PLUMBING - FINAL | Approved | ||
| 10/14/2019 | PLUMBING - FINAL | Denied | 1- The comments from previous inspections have not been addressed. 2- I can not enter the house without a adult present at the time of inspection request. 3- Shall make all corrections as requested or possible re inspection fee will be applied. |
|
| 10/11/2019 | PLUMBING - FINAL | Denied | 1- Shall expose all replaced underground piping. 2- Shall provide a ground bond on the gas line. 3- Shall provide a carbon monoxide detector and locate it in the hallway to the bedrooms. 4- Shall remove the mechanical tape around the Furnace double wall flu vent. 5- Shall provide combustion relief vents at water heater enclosure as requested. |
|
| 10/09/2019 | PLUMBING - FINAL | Denied | Recall with gas test. | |
| 10/07/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a air pressure test on the entire system at the time of inspection request. 2- Shall provide access to all appliances inside dwelling at the time of inspection request. 3- Shall provide combustion air vents for the water heater room. |