Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2022 |
COT - LCBU - Framing |
|
Canceled |
Inspection Canceled |
| 12/03/2019 |
COT - LCBU - Framing |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Shall seal all top plate penetrations with fire rated foam or caulk.
2- Shall secure the electric conductors within 6 inches of the switch box at entry
3- Shall provide (3) sided blocking for the forced air vent. |