Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2019 | PLUMBING - GAS RECONNECT | Approved | Clear gas meter Verbal clearance called in at 1:42pm |
|
| 10/02/2019 | PLUMBING - GAS RECONNECT | Denied | 1- Shall provide a air pressure test on the entire system minimum of 10 lbs. at the time of inspection request. 2- Shall provide an approved trailer gas flex connector at meter connection. 3- Shall provide a carbon monoxide detector and locate it in the hallway to the bedrooms. |