Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T19CM06933

Parcel: 118050320

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
06/01/2020 BUILDING PRE-SLAB Approved approved
1- okay to pour footings and saw cut areas
05/28/2020 BUILDING PRE-SLAB Denied denied
1- The contact number on the permit is the previous General Contractor who is no longer on the job. There was no message given on the inspection request.
03/12/2020 BUILDING PRE-SLAB Denied 1- There are numerous locations where the masonry footing has less of 8 inches of concrete. Reference section R404 2018 IRC
03/03/2020 BUILDING PRE-SLAB Denied 1- Shall remove all rocks out of plumbing trenches as requested and provide clean fill and proper compaction. There is numerous voids under the existing slab.
2- Shall expose exterior new footings for verification of the minimum 12 inches of footing depth at all corners and center of footings.
3- Shall provide a minimum of 4 inches of concrete at Shower.