Permit: T19CM06477

Parcel: 133200160

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
07/30/2020 ENGINEERING - FINAL Approved . Approved.
07/29/2020 ENGINEERING - FINAL Not ready for Inspection Not ready. Complete all notes from last inspection.
07/20/2020 ENGINEERING - FINAL Partial Approval PARTIAL, OK FOR TCO, FINAL NOT TO BE GIVEN TILL ALL EXTERIOR WORK ABOVE OR ADJACENT TO PEDESTRIAN ACCESS AREAS IS COMPLETE AND APPROVED.
07/09/2020 ENGINEERING - FINAL Not ready for Inspection Not ready. Complete all overhead work at all entrances and exits for building.(Life safety).Complete work for finals.
07/08/2020 ENGINEERING - FINAL Not ready for Inspection Not ready. Complete all exterior work before calling for final per Dave Roberts.
07/02/2020 ENGINEERING - FINAL Partial Approval IS PARTIAL AT THIS TIME, OK FOR TCO STOCKING ONLY PENDING ALL OTHER INSPECTIONS BEING APPROVED FOR THIS PERMIT, AND CLARIFICATION OF THE ZONING FINAL REQUIREMENTS.
ADDITIONAL PERSONNEL HAVE BEEN NOTED WITHIN THIS STRUCTURE ON THIS DATE DURING MY INSPECTION. I HAVE ADVISED DAVID/CAYLOR CONSTRUCTION THAT THEY NEEDED TO LEAVE THIS SITE. NO ONE IS ALLOWED ON THIS SITE EXCEPT CAYLOR PERSONNEL AND THEIR SUBCONTRACTORS.
07/01/2020 ENGINEERING - FINAL Not ready for Inspection Not ready. Complete all work on development package DP18-0280 before calling for Engineering final.
06/26/2020 ENGINEERING - FINAL Not ready for Inspection Not ready. Complete all work on development package before final.