Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 11/12/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Horizontal vent in hall bathroom shall be 6 inches above the flood level rim of the fixture. |