Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2020 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 01/30/2020 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall provide the required test gage for the gas line. 2- Shall provide approved straps on the gas line. P-Tape not listed material. 5- Re test the DWV system 3- Shall provide (3) sided blocking on all forced air vents. 4- The lavatory and Clothes Washer waste line can be wet vented to the water closets vents. |
|
| 01/24/2020 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | 1- Work is incomplete |