Parcel: 11516024A

Inspection Status: Approved

Inspection History: FIRE - FINAL

Date Description Inspector Results Comments
10/29/2019 FIRE - FINAL Approved
10/28/2019 FIRE - FINAL Partial Approval -Knox box has been ordered, contact TFD when installed
-Metro Fire needs to call in their Fire Alarm Final inspection.

Previous alarm notes-
-Need alarm final. These are notes from last alarm inspection.
-install pull station
-horn/strobe on prints. install or submit revision.
-correct the time/stamp on panel.
-add red breaker lock.
-reinspection fees added. must be paid prior to next inspection. this was our second inspection. first was a no show by metro.
10/25/2019 FIRE - FINAL Partial Approval -Need alarm final. These are notes from last alarm inspection.
-install pull station
-horn/strobe on prints. install or submit revision.
-correct the time/stamp on panel.
-add red breaker lock.
-reinspection fees added. must be paid prior to next inspection. this was our second inspection. first was a no show by metro.

-mount all extinguishers.
-order knox box, provide keys, mount box next to front door.
-suite numbers on rear doors.
-second exit required on the S portion of bldg. change out lockset on north exit door that leads into lobby so it can be used as an exit door.