Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2019 | PLUMBING - FINAL | Approved | ||
| 09/09/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a flu vent for the water heater minimum of 5 feet. 2- Shall provide a gas bond on the system. 3- Shall provide a carbon monoxide detector. 4- Shall secure the gas line drop to the wall for the he dryer. 5- Shall provide 10 psi air test on system. 6- Shall provide a T & P drain for the water heater and terminate it 6 inches above base. |