Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2019 | PLUMBING - FINAL | Approved | ||
| 09/26/2019 | PLUMBING - FINAL | Denied | 1- Shall connect the electric conductors to the water heater. 2- Shall provide a T & P drain line and terminate 6 inches above sub grade. 3- Rear hose bib is very loose and requires a vacuum breaker. 4- Shall secure the floppy electric conduit to the water heater. ANOTHER FAILED INSPECTION WILL RESULT IN A RE-INSPECTION FEE |
|
| 09/24/2019 | PLUMBING - FINAL | Denied | 1- Shall provide a water hammer arrestor for the dishwasher water supply line. 2- Shall provide water hammer arrestors for the Clothes Washer hot and cold supplies. |
|
| 09/18/2019 | PLUMBING - FINAL | Denied | 1- Gate locked no access at the time of inspection request. I could not leave a message when I called 312-4142 because voicemail was not set up.1:27 pm |