Inspection History Details
Inspection Status: Partial Approval
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2019 | BUILDING PRE-SLAB | Partial Approval | 1- Shall provide a sealed letter from the Structural Engineer that she will accept the option of providing dowels and mono pour in lieu of key lock as per plan. Pour concrete at own risk. |
|
| 10/15/2019 | BUILDING PRE-SLAB | Partial Approval | PREVIOUSLY AP RE-OPENED PER CUSTOMER REQUEST |