Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2019 | PLUMBING - FINAL | Approved | T&P piping needs to be hard piped galvanized or copper. Valve needs to be installed on the range | |
| 08/19/2019 | PLUMBING - FINAL | Denied | 1- The system appears to have a small leak. 2- Shall provide a sediment trap for the Gas pack on roof. 3- Shall provide a ground bond on the system. 4- Shall provide combustion ai4 vents Atwater heater enclosure. |