Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2020 | PLUMBING - FINAL | Approved | REVIEW OF WATER DISINFECTION REPORT COMPLETED | |
| 01/06/2020 | PLUMBING - FINAL | Partial Approval | Awaiting results from decontamination report | |
| 01/03/2020 | PLUMBING - FINAL | Cancelled | Canceled by supervisor | |
| 01/02/2020 | PLUMBING - FINAL | Not ready for Inspection | water line disinfection | |
| 12/11/2019 | PLUMBING - FINAL | Denied | 1- The trap arm for the floor sink shall be a minimum of two times the pipe size. 2- provide permanent caps for all unused waste lines. 3- Re test the DWV system. |
|
| 12/11/2019 | PLUMBING - FINAL | Partial Approval | 1- Underground rough plumbing is okay to cover. |