Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19CM05759

Parcel: 141021070

Inspection Status: Approved

Inspection History: ELECTRIC - CONSTRUCTION POWER

Permit Number - T19CM05759

Inspection Description - ELECTRIC - CONSTRUCTION POWER

Inspection Status - Approved

Date Description Inspector Results Comments
12/02/2019 ELECTRIC - CONSTRUCTION POWER Approved
11/19/2019 ELECTRIC - CONSTRUCTION POWER Not ready for Inspection DWV not complete. Bonding to gas pipe not installed. Provide GFI receptacles for construction power. Anchor bolts missing on Exterior walls. Electrical boxes at stairwell require bushings. Flue pipe requires clearance to combustible. Provide engineered documentation on truss repair where truss was cut to allow clearance for flue pipeInspections stopped at this time this is not a complete list.