Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2019 | ENGINEERING - FINAL | Approved | ||
| 10/28/2019 | ENGINEERING - FINAL | Not ready for Inspection | Patch the broken asphalt ahead of the ramp. Remove construction debris and dirt. Remove concrete forms. Call for inspection once the work is been completed. No one on site. IVR system is down, unable to check for messages |
|
| 10/23/2019 | ENGINEERING - FINAL | Not ready for Inspection | Call for final inspection after the work is been completed. |