Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2020 | FIRE SPKLR - FINAL | Approved | ||
| 04/27/2020 | FIRE SPKLR - FINAL | Denied | 1. Will need Annual and 5 yr Check Valve sprinkler inspections. 2. Fix corroded piping on riser. 3. Make sure tamper and flow switch are wired to new FACP. |
|
| 04/24/2020 | FIRE SPKLR - FINAL | Denied | 1.nobody on site 0915 no access, doors locked no message or call back number 2.Spinkler contractor shall call in their permit for inspection 3.Re-inspection fee added to permit. Shall be paid for prior to final |