Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2019 | PLUMBING - FINAL | Denied | 1- Pressure test was not holding, check the system for leaks. 2- Shall extend the wall furnace flu vent and terminate it 3 feet above the cooler. |
|
| 08/02/2019 | PLUMBING - FINAL | Approved | Clear gas meter Verbal clearance called in at 1:35 pm. |