Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2019 | PLUMBING - GAS PRESSURE TEST | Approved | Clear gas | |
| 07/24/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall remove the tee and provide a 90 degree fitting on the gas line at front entry to house. 2- Shall provide a carbon monoxide detector. 3- Shall provide a minimum of 1 inch annular space around the water heater flu vent. 4- Retest the system. |