Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 08/20/2021 |
FRAMING |
|
Approved |
AP |
| 07/02/2021 |
FRAMING |
|
Partial Approval |
Partial Approval-Hard lids for Level Six. |
| 06/30/2021 |
FRAMING |
|
Partial Approval |
(Partial inspection for corridor hard lids of Level Six)-DE-1-Fire caulk holes above ceiling throughout. |
| 06/23/2021 |
FRAMING |
|
Partial Approval |
PA Restroom. W110 |
| 06/21/2021 |
FRAMING |
|
Partial Approval |
PA. Level One: mailbox framing. |
| 06/18/2021 |
FRAMING |
|
Partial Approval |
PA. Level Four: Hard lids in corridors of Elevator Lobby, and by Units 408/409. |
| 04/08/2020 |
FRAMING |
|
Not ready for Inspection |
|
| 04/06/2020 |
FRAMING |
|
Not ready for Inspection |
|
| 04/03/2020 |
FRAMING |
|
Not ready for Inspection |
|