Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T19CM05174
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2021 | BUILDING PRE-SLAB | Approved | AP | |
03/16/2020 | BUILDING PRE-SLAB | Partial Approval | Middle and northeast slabs ok to pour | |
03/11/2020 | BUILDING PRE-SLAB | Partial Approval | Ok to pour slab A - L to 6 - 10 | |
02/05/2020 | BUILDING PRE-SLAB | Partial Approval | NE elevator and stair footings ok to pour. | |
02/04/2020 | BUILDING PRE-SLAB | Partial Approval | Set columns ok, prepped columns ok, need to check the setups in am. 5 E, 5 B.1, 4 E, 4 D.1, 3 E, 3 B.1, F 2.3, F 2, F 1, G 1, G 2, G 2.3, H 1, H 2, I 1 |
|
01/30/2020 | BUILDING PRE-SLAB | Partial Approval | Ok to pour north wall footings except where water leak is on west end | |
01/27/2020 | BUILDING PRE-SLAB | Partial Approval | GL I to F and 3.8 to 5 F9 and F3 footings Ok to pour |
|
01/10/2020 | BUILDING PRE-SLAB | Partial Approval | Northeast corner- East wall and west wall. Ok to place shot Crete. | |
01/09/2020 | BUILDING PRE-SLAB | Partial Approval | Stems B5 - 3.5 E and W stairs ok to grout to 10’ 8” Footings 1 -3 and A1 to B ok to pour. F1 - E9 and F1 - 1.8 to 2.5 ok to grout 3 course lift to bond |
|
01/08/2020 | BUILDING PRE-SLAB | Partial Approval | West and east walls of north wing ok to shoot. | |
01/07/2020 | BUILDING PRE-SLAB | Partial Approval | Bottom level of shotcrete grid, on south 2/3 of east wall, ok to shoot. | |
01/06/2020 | BUILDING PRE-SLAB | Partial Approval | E wall 28 to 36 ok to shoot shotcrete grid. W wall of NE wing 42 to 48, ok to shoot shotcrete grid. |