Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19CM05078

Parcel: 13608032A


Addresses:

2200 S HOUGHTON RD


Inspection Status: Passed

Inspection History: COT - HCME - Hydronic Piping 

Permit Number - T19CM05078

Inspection Description - COT - HCME - Hydronic Piping 

Inspection Status - Passed

Date Description Inspector Results Comments
05/09/2022 COT - HCME - Hydronic Piping  ESTEVENS Approved Entered by VVERA1 - Approved
03/29/2022 COT - HCME - Hydronic Piping  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Level #2, Area B, future hot/cold lines. Level #3, hot and cold domestic lines; Ok to insulate progress areas.
03/18/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Elevator machine room. Blower coil.
03/10/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Low pressure steam and condensate lines in CPE area.
03/03/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. Area B. Level two
02/25/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. Low and high 1pressure steam in CEP Area
02/14/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. CEP room / riser and penthouse. Lower pressure steam and steam condensate lines. Schedule 80 pipe. CEP room, / risers, building mains, and penthouse. Schedule 40 pipe and copper.
01/20/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Level 2. Area C and A. Steam and condensate lines
01/10/2022 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Level 1 AreaC. Heating water to VAV 4-8, 4-9, 4-7, 4-10, 4-11, 4-5, 4-3, 4-12. 4-4, 4-1, 4-2, Area D. Heater water to VAV 1-18, 1-19, 1-21, 1-20, 2-4, 1-4, 1-2, 1-3, 1-6, 1-7, 1-8, 1-12, 1-13, 1-14, 1-1, 1-5, 1-9, 1-10, 1-11, 3-14, 3-15, 3-16, 3-17. 3-9, 3-10, 3-7, 3-5, 3-6, 3-3, 3-1, 3-4, 3,-2,
12/30/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. Level 2. North wing. Area A. Heating water to VAV 10-20, 11-34, Level 2. Area C. Heating water to VAV 9-7, 9-9, 9-8, 9-6, 9-4, 9-5, 9-3, 9-1, 9-2, 9-16, 9-15, 9-14, 9-17, 9-18, 9-20, 9-22, 9-24, 9-25, 9-26, 9-27, 9-28, 9-13, 9-29, 9-11, 9-12.
12/23/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. Area C, Level 1. RTU's 1,2,4,14. Level 2. Area A eastside. Heating water to VAV 11-12, 11-3. 11-2, 11-1, 11-4, 11-5, 11-16, 11-6, 11-7, 11-17, 11-8, 11-9, 11-10, 11-11, 11-18, 11-19, 11,-28 11-19, 11-28, 11-13, 11-27, 11-28, 11-25, 11-24, 11-23.
12/10/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Level 1. Lab area, pharmacy and sterile area.
11/23/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Level one to level two. Area C. To RTU’s 3, 9 and 11.
11/09/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. Level 2. Area A. All units.
10/06/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - . Partial. Connecting 7 VAV's from main. VAV, 3-19, 3-21, 3-23, 3-22, 3-24. 3-20, 3-18.
09/17/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by VVERA1 - Partial. All of area B.
08/31/2021 COT - HCME - Hydronic Piping  ESTEVENS Partial Approval Entered by NGARCIA3 - Partial. From CEP Area to Area A to RTU's 5 and 6. Area C to RTU's 1 and 2.