Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2019 | ELECTRIC - RECONNECT | Approved | RECN ok to clear. Clearance for construction power only, exterior receptacles at panel to be energized only, receptacles to be GFI protected prior To being energized. Mechanical to be added to permit, gas piping to be added to permit, do not cover gas until inspected. PLEASE COME IN TO HAVE PLANS REVISED SO WE MAY ADD THESE INSPECTIONS TO THIS PERMIT. THANK YOU | |
| 08/05/2019 | ELECTRIC - RECONNECT | Denied | House is being fully remodeled, sheet rock removed wiring exposed, some damage to wiring,Contractor states there is another permit for remodel work, I advised to call under remodel permit for construction power. | |
| 07/19/2019 | ELECTRIC - RECONNECT | Not ready for Inspection | Arrived at site at 8:30. No one present for access. Recall |