Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2019 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 07/17/2019 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall provide the required test gage of 15 lbs max with 1/10 increments. 2- Shall provide a gas bond on the system. 3- Shall provide a carbon monoxide detector in hallway. |