Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2019 | PLUMBING - FINAL | Approved | ||
| 07/15/2019 | PLUMBING - FINAL | Denied | 1- Shall remove the mechanical tape from the flu vent and provide (3) sheet metal screws per joints and at water heater draft collar. 2- Shall install the sediment trap properly. The shut off valve shall be located up stream of the sediment trap and bull head the tee on the sediment trap. |