Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2019 | ELECTRIC - SERVICE UPGRADE | Approved | was approved and clearance for increase done with TEP on 7-15-2019. I tested the panel today and it has power, GFCI may be faulty. |
|
| 07/15/2019 | ELECTRIC - SERVICE UPGRADE | Approved | Gas bond in and UFER installed in slab pour and clamped to rebar in footing with Approved clamp. The house is now PEX and has no interior metal or copper water piping. TEP was called for Clearance, INCR. Roman. Done. |