Permit: T19CM04836

Parcel: 117131620


Addresses:

141 S STONE AV

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
07/20/2021 BUILDING PRE-SLAB Approved
04/17/2020 BUILDING PRE-SLAB Not ready for Inspection Inspection to be performed by Terracon on 18 April at 2:00. Results and photos will be forwarded to this office.
04/13/2020 BUILDING PRE-SLAB Partial Approval 1- Steel reinforcement is okay for concrete on the
04/06/2020 BUILDING PRE-SLAB Partial Approval Level three line 1-17, ten feet from D-E to H-I.
03/24/2020 BUILDING PRE-SLAB Partial Approval Level 2/Garage level 3, GLsA-D.74, 1-16
03/19/2020 BUILDING PRE-SLAB Partial Approval Level 2Garage Level 3 PT inspection, via SI report.
03/16/2020 BUILDING PRE-SLAB Cancelled Called Mike to inform that we will accept SI reports in lieu of field inspections per CBO during Coronavirus incident. Asked him to submit field inspection report, along with pictures of electrical embedments. I will update records upon receipt of these.
03/06/2020 BUILDING PRE-SLAB Partial Approval From level1.5 to level 2.
03/01/2020 BUILDING PRE-SLAB Partial Approval Level 1.5 ok to pour.
02/28/2020 BUILDING PRE-SLAB Cancelled per phone call with customer.
02/25/2020 BUILDING PRE-SLAB Partial Approval Level one, Pour three, balance of Level one.
02/21/2020 BUILDING PRE-SLAB Partial Approval Level 1.5 first pour.
02/19/2020 BUILDING PRE-SLAB Partial Approval Level one, Southeast corner and generator room.
02/18/2020 BUILDING PRE-SLAB Partial Approval Ramp to level 1.5.
02/13/2020 BUILDING PRE-SLAB Partial Approval South half, except for ramp and generator room.
02/07/2020 BUILDING PRE-SLAB Partial Approval GLs D-H, 1-17. Level one.