Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2021 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 03/01/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Level 1.5 ok to pour. | |
| 02/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | REOPENED FOR REINSPECTION | |
| 01/31/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Work incomplete. | |
| 01/21/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | on-site by contractor. | |
| 01/16/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement is okay for concrete at the elevator shaft core @ North center of bldg. between grid lines C thru D and grid line 6. | |
| 01/10/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footing GL12 from GLD-E. | |
| 01/09/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Work incomplete. | |
| 01/08/2020 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | on-site by contractor. | |
| 01/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GL-E from GL12-13. | |
| 01/03/2020 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | Work incomplete. | |
| 01/02/2020 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns at GLs C13, C16, and Stair 2. | |
| 12/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Columns 10B, 10C, 11A, 13B and 15A | |
| 12/16/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Column footing (F-8) at GL: B/5; (F-7) at GL: C/5. Concrete columns at GL: E/1; E/12; E/14. Stairwell #3, double matted at GL: B-C; footings. | |
| 11/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Line 1 E.5/G.3 Line 2 H Line 8 H Line 12 H Line 12 E Line 12.5/17 E Ok to proceed |