Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2019 | PLUMBING - SEWER HCS CONNECT | Approved | ||
| 09/17/2019 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- Minimum depth of sewer line located in the easement shall be 4 feet to the top of the pipe. 2- Sewer main tap is okay. |
|
| 09/17/2019 | PLUMBING - SEWER HCS CONNECT | Denied | 1- Minimum depth of sewer line located in the easement shall be 4 feet to the top of the pipe. 2- Sewer main tap is okay. |
|
| 08/15/2019 | PLUMBING - SEWER HCS CONNECT | Partial Approval | need something showing approval for multiple houses tying into one HCS connection. |