Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T19CM04696
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/20/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
08/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | South side of rink by sump. | |
08/14/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | jet ice equipment pad, French drain by ice rink, and fan coil pad ok to pour concrete. | |
08/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ice rink rebar mat installed and ready for concrete pour. Test also performed on ammonia piping lines, has held for three days. | |
07/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | sump pump ok to bottom of lid. | |
07/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | no new work today | |
07/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | equipment pads OK to pour. Make sure rebar is lifted up to its correct elevation before pouring while maintaining clearances on sides. | |
07/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | middle trench of ice rink OK to pour. Before pour make sure to move horizontal rebar there should be one horizontal tied at the ends of the tails on either side of the trench, take photos of fix please. |