Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2019 | BUILDING ABOVE CEILING | Approved | ||
| 09/09/2019 | BUILDING ABOVE CEILING | Partial Approval | Mechanical and Plumbing ok. Electrical to still be looked at after ceiling grid and fixtures are installed. |