Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 12/18/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide directional fittings for the water closet. 2- Shall use the approved solvent weld cement for ABS material. 3- Re test the DWV system. |