Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2019 | ELECTRIC - SERVICE UPGRADE | Approved | TEP Clearance, INCR THE SERVICE PANEL THAT WAS INSTALLED HAD TO BE REPLACED PER TEP STANDARDS. A SECOND CLEARANCE WAS SENT ON 7/2/19 BY BSTEVENS | |
| 06/26/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | Borris will recall for Thursday. Need ladder for gas to water bond insp in attic. Service Panel door needs work so it opens and stays shut correctly. LB needs screw to water tight it’s cover. |
|
| 06/25/2019 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | No bonding or grounding installed House is vacant. Employees will recall when ready for inspection on a future date This was a power cut, spoke with Roman at TEP, he will send out a crew to make safe and secure the taped but hot SE Cables laying on the ground. |