Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2020 | PLUMBING - ROUGH, SOIL | Approved | Approved. Ok to cover progress areas. | |
| 07/20/2020 | PLUMBING - ROUGH, SOIL | Denied | denied 1– Shall install the bathroom group as per chapter 9 2018 IPC. 2- Shall provide a water head test on the system. 3- Shall provide tracer wire on the bldg. sewer. |