Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T19CM04364
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2019 | ENGINEERING - FINAL | Approved | ||
11/14/2019 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO FOR OCCUPANCY, FINAL NOT TO BE GIVEN | |
11/13/2019 | ENGINEERING - FINAL | Partial Approval | THE CONTRACTOR IS WORKING ON INSTALLING THE BOLLARDS IN THE TRASH ENCLOSURES, THIS SITE WILL BE CHECKED LATER TODAY AFTER THE WORK HAS BEEN COMPLETED. | |
11/01/2019 | ENGINEERING - FINAL | Partial Approval | THIS PERMIT IS OK FOR THE TCO STOCKING ONLY, FOR THE INSTALLATION OF MATERIALS INTO THE STORE. IT WILL NEED TO BE RE-INSPECTED PRIOR TO THE ISSUANCE OF A FULL TCO FOR BUSINESS OR FOR THE FINAL C OF O. | |
10/25/2019 | ENGINEERING - FINAL | Not ready for Inspection | Inspection is for trash enclosure slab. OK for concrete, three enclosures. Recall inspection for placement of bollards, note they must be 3 foot deep and stick up 4 feet above slab | |
10/23/2019 | ENGINEERING - FINAL | Not ready for Inspection | SITE VISIT ONLY TO LOOK AT THE TRASH ENCLOSURES FOR THE POURING OF THE FLOOR SLABS. THE INSPECTION HAS BEEN DENIED FOR THE TRASH ENCLOSURES DUE TO WORK NOT BEING PER THE APPROVED STANDARDS. THE CREW WILL SET THE BOLLARDS OR SONOTUBES IN THE CORRECT LOCATIONS PER THE DESIGNATED DETAIL. ADD #4 REBAR AT 12 INCHES ON CENTER IN THE AREA OF THE FLOOR SLABS ONCE THEY HAVE PROVIDED A CLEAR 6 INCHES OF FREE SPACE FOR CONCRETE. REMOVE ALL EXCESS MATERIAL FROM THE BOLLARD AND GATE POST FOOTER AREAS TO ENSURE THE REQUIRED CONCRETE COVERAGE IN THE FOUNDATIONS. ALL OF THIS WORK HAPPENING AT THIS TIME IS ON A COMBINATION PERMIT, AS WELL AS OTHER WORK NOT SHOWN THAT WILL BE COMPLETED IN THE NEAR FUTURE. A DEVELOPMENT PACKAGE SHOULD HAVE BEEN REQUIRED ON THIS SITE FOR ALL EXTERIOR WORK, I WILL BE QUESTIONING IF WE NEED A DEVELOPMENT PACKAGE TO BE STARTED TO COMPLETE ALL THE SITE WORK. |