Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T19CM04364
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
10/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Pan decking over closets and seating area fo4 light weight concrete is okay. 2- Steel reinforcement provided in Trash Enclosure footings. |
|
09/18/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Store front and bank area. | |
09/09/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement mat for the north side is okay for concrete. | |
09/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | 1- Work is incomplete | |
09/03/2019 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
08/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | North south running main sawcut and various smaller patches in middle of store, and loading dock area ok to pour concrete. Make sure compaction is completed several spots do not appear compacted. North and east sides of main sales floor will still need to be inspected. | |
08/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Sanitary and Grease waste rough plumbing is okay between grid line 3.19 to East demising wall and between 3.20 to 3.23.5 only. Okay to backfill trenches. | |
08/22/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | under tortilleria area ok, lift rebar mat or put it on blocks to maintain clearances. | |
08/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1- Steel reinforcement mat is okay for concrete between grid lines 3.20 South to grid line 3.23 North as noted on plan. |