Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2019 | FRAMING | Approved | ||
| 06/21/2019 | FRAMING | Correction Required | Framing looks good although patio built as existing slab. Footings unknown! Dig up dirt at footing areas to expose depth and width. New gas meter installed from alley to back wall of house. Spoke to Bruce about TEP’s supply line to meter. Concrete ribbon will be cut at meter location to ventilate as open patio cover Will see ribbon cut and footings at call for final |
|
| 06/20/2019 | FRAMING | Denied | No access. Another failed inspection will result in a reinspection fee. |