Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/14/2020 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 04/27/2020 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
RVI Not ready, not complete. |
| 02/28/2020 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
From the chiller unit location to inside the building |
| 11/01/2019 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
All DWV's under slab. Two 8" water chiller lines on west side of building. 5' inside and outside of building. |
| 10/31/2019 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
not complete. |
| 10/22/2019 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Plumbing. Partial. From A1 to C1, from A 3.6 to C3.6. |