Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T19CM04120
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Not ready for inspection | |
08/23/2019 | PLUMBING - INTERMEDIATE | Approved | Based on photos supplied by the contractor | |
08/22/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Reference comments from previous inspection. | |
08/21/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall locate the horizontal vent for the second floor water closet a minimum of 6 inches above the flood level rim of the fixture. 2- Shall provide a clean out on the 2 inch waste stack. 3- Shall secure the horizontal water lines every 32 inches. 4- Shall extend the vent for the second floor lavatories thru the roof. |
|
08/16/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Plumbing is incomplete inspection stop. |