Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2019 | PLUMBING - FINAL | Approved | ||
| 10/09/2019 | PLUMBING - FINAL | Cancelled | canceled by office call | |
| 10/08/2019 | PLUMBING - FINAL | Correction Required | Reattach gas bond. | |
| 10/04/2019 | PLUMBING - FINAL | Denied | 1. Detach new pipe from meter and redo pressure test. Gauge reads 0 at present. 2. Redig trench for 12" depth. 6 to 8" for most of run at present. |