Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/19/2022 |
ENGINEERING - FINAL |
|
Approved |
|
| 08/27/2021 |
ENGINEERING - FINAL |
|
Partial Approval |
IS PARTIAL AT THIS TIM, OK FOR TCO. I MET WITH OSCAR QUIROZ ON-SITE AND LOOK AT THE RAMPS AND STAIRS ON THE NORTH SIDE OF THE BUILDING. THEY ARE MISSING THE HANDRAIL AGAINST THE EXISTING WALLS FOR ALL THE RAMPS. HE TOLD ME THAT THEY ORIGINALLY HAD THE RAILS ON-SITE PREVIOUSLY BUT THE SUPERVISOR HAD INSTRUCTED THE INSTALLERS NOT TO ATTACH THEM TO THE WALLS. HE WILL HAVE THE RAILS INSTALLED AND THEN WILL RESCHEDULE THE INSPECTION FOR NEXT WEEK |
| 08/16/2021 |
ENGINEERING - FINAL |
|
Continued |
9027 (ENGINEERING - FINAL) CN /NEED TO INSTALL THE HANDRAIL AND ADD D.G IN BACK OF SIDEWALK. |