Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2019 | ELECTRIC - SERVICE UPGRADE | Approved | Clear incr | |
| 06/10/2019 | ELECTRIC - SERVICE UPGRADE | Correction Required | Ground rods to be a min of 6’ apart, these rods are 5’-9" apart. Theoretically the water is the primary or fist bond and the gas is the secondary bond after the ground rod system. |