Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T19CM03575

Parcel: 116161940


Addresses:

855 N CONTZEN AV

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
09/30/2019 ELECTRIC - FINAL Approved Clear dgc.
09/27/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
09/23/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
09/20/2019 ELECTRIC - FINAL Denied plans are not stamp approved by the plan review department. Re inspection fee applies.
09/18/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
09/06/2019 ELECTRIC - FINAL Partial Approval Plan shows 100 amp main breaker, installed 150 amp breaker.
09/05/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
08/14/2019 ELECTRIC - FINAL Not ready for Inspection main solar breaker is not the correct size. Cannot have gaps in the dead front of the combiner box either add missing breaker or get blank cover. Labels need to be removed off of conduit’s that are not carrying DC power due to micro inverters. Solar panel layout not per drawing in fact doesn’t even show any panels on the east side of the house, please revise or build per drawing.
08/13/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
08/12/2019 ELECTRIC - FINAL Not ready for Inspection on-site at 9:45am fence around property locked up and gates closed, no knowledge of pets on premises. No messages left for inspector.
08/08/2019 ELECTRIC - FINAL Cancelled IVRS - AP canceled
08/06/2019 ELECTRIC - FINAL Partial Approval FOR REVISION 1
07/15/2019 ELECTRIC - FINAL Approved Clear electric DGC
07/12/2019 ELECTRIC - FINAL Denied 1- Shall provide the approved plans onsite at the time of inspection request